Skip to content

Connecting business. Building understanding. Advancing peace.

China Harbour Completes Underground Utility Gallery for Jeddah Central Development Project

China Harbour Engineering Company has completed the main concrete structure of an underground service pipe gallery in western Saudi Arabia. The 1,507-meter installation forms part of the Jeddah Central Comprehensive Development Infrastructure Project under Saudi Vision 2030. The completion enables subsequent mechanical, electrical, and smart city pipeline installations.

Illustration: A modern underground utility tunnel under construction with reinforced concrete walls and heavy civil engineering frameworks, illuminate
Illustration

China Harbour Engineering Company has completed the main concrete structure of the underground service pipe gallery for Road 3 and Road 16 under the Jeddah Central Comprehensive Development Infrastructure Project, according to reportage from Seetao citing the Chinese Embassy in Saudi Arabia.

The project is situated in the city center of Jeddah along the Red Sea coast and forms part of the infrastructure initiatives advancing the Saudi Vision 2030 framework. The broader development covers municipal roads, comprehensive utility corridors, service buildings, landscape architecture, and smart city systems intended to support tourism, culture, sports, and entertainment facilities.

The finished underground gallery measures approximately 1,507 meters in length and utilized approximately 40,000 cubic meters of cast-in-place concrete alongside 5,600 tons of steel reinforcement. The gallery incorporates standard, connecting, and transition sections, adopting single-layer or double-layer configurations depending on area specifications.

The report stated that the construction team faced technical constraints including coastal groundwater management, permeable soil, high ambient temperatures, and sudden winds. The contractors utilized Building Information Modeling (BIM) technology to coordinate structural models with adjacent underground utilities, conduct groundwater pumping tests, and execute slope stability assessments prior to completing the structure.

With structural completion achieved across the service pipe gallery, the project advances to subsequent construction phases, including mechanical and electrical installations, pipeline laying, and surface road construction.

Sources

The UECN Brief

Policy updates, China–UAE business news and industry insights, delivered to your inbox.

Language
Subscriptions

Double opt-in: we send a confirmation link. Unsubscribe at any time. Privacy